Volume Generated:1983 tons removed for a 99.5% diversion rate
Scope
Cut 40,000 SF structure in half for adaptive reuse.
Demolish (1) 20,000 SF structure, including foundation, down to the dirt.
Demolish (1) 20,000 SF two-story structure back to exterior tilt-up walls.
Install tilt-up bracing to support the load during the demolition of 2nd floor and roof.
Removal of 48 trees, 600 linear feet of curb and gutter, 1680 cubic yards of concrete.
In-house fabrication of custom steel shaker plates for long construction entrance.
Install and maintain compliance of stormwater prevention program, including sediment filters in storm drains, perimeter straw wattle, covering all stockpiles, weed abatement.