Scope

  • Coordinate with City of Half Moon Bay and Coastal Commission to obtain beach access for crews and heavy equipment.
  • Coordinate with AECOM and Environmentalists to develop a safe and efficient work plan.
  • Coordinate with Ritz Carlton and HMB Golf Links to establish ingress/egress to the job site.
  • Obtain $35,000,000.00 project-specific GL policy from surety company, prior to commencement.
  • Install and maintain (1) 600′ construction road, starting at the end of Miramontes Point, finishing at the bluff edge. The road consisted of post-driven chainlink fencing with privacy mesh and 1.5″ steel plating.
  • Remove and dispose of exposed piers and grade beams.
  • Demobilize crane and equipment and disassemble construction road.