- Emergency response required full mobilization within 3 hours.
- Demolish fire-damaged structure down to the slab and remove debris from roadways.
- Recover salvageable property inside and submit to San Leandro PD.
- Use caution around energized upper and lower power lines, 2′-3′ from the structure.
- Coordinate with Fire Department, PD, city officials, news team.
- Work double shifts, around the clock to finish within 24 hours, minimizing road closure and public hazard.