OSHA sets the standards for The Control of Hazardous Energy, or Lockout/Tagout (LOTO), in 29 CFR 1910.147. This regulation puts into place safety procedures in the workplace to ensure that dangerous or hazardous machinery is properly shut down. In addition, this machinery cannot be restarted prior to servicing or maintenance work. This requires that the energy sources be isolated thereby rendering the equipment and machinery inoperable. These standards are especially important during a demolition.

Lockout/Tagout in Demolition Ensures Safety

LOTO is a key procedure to protect personnel from unexpected startup or energization of machinery, including the release of hazardous energy during activities such as demolition, installation, or routine maintenance. Hazardous energy includes electrical, chemical, mechanical (gravitational, rotational), pressure, vacuum (pneumatic, hydraulic), thermal, and other energies that could cause harm. These procedures apply to fixed, permanently installed, portable, and temporarily installed equipment.

This critical procedure protects against the serious physical injuries that could occur when a hazardous piece of equipment suddenly starts up. These injuries include:

  • Shock and electrocution
  • Burns
  • Cuts and slices
  • Pinching and Crushing
  • Death

SV Demolition Safeguards Workers and Properties

Safeguarding workers, utilities, and adjacent properties is a top priority as SV Demolition. Demolition activities can range from remodeling an area within a building to dismantling an entire structure and this can consist of multiple tasks that are hazardous by nature. One of those crucial tasks is shutting off, capping, or controlling all electricity, gas, steam, water, sewer, and other services, and this must be done with strict accountability from beginning to end. If power, water, or other utilities must remain on during demolition, these lines need to be temporarily relocated and/or protected. The location of any overhead power source must also be considered carefully because they can be particularly dangerous in a demolition.

Isolating Energy Sources

As a key step in preparing a building for demolition, all hazardous energy sources must be isolated to prevent injuries. The sources must be isolated and then locked with a tag on the lock. This tag identifies the worker who placed the lock and tag, and that individual holds the key. When completed properly, this prevents any machinery or equipment left on site from sudden startup during a demolition.

When preparing a site for demolition, SV Demolition works closely with the building owners to ensure that all LOTO procedures have been followed. We never assume that each step has been carefully completed, rather we see ourselves as apartner to ensure that all personnel are safe. This takes a comprehensive knowledge of and appreciation for the applicable OSHA regulations.

SV Demolition has the skills, knowledge, and experience to ensure that all safety standards are met and exceeded. Contact us today to learn how we can assist with OSHA requirements on your demolition projects.

More Stories

Robotic Technology in Demolitions

Published 26th Dec 2019
Demolition crews have used robots for decades, but advancements in technology mean that more contractors have adopted their use. This is especially true with the …

Red Flags to Avoid when Hiring a Demolition Contractor

Published 06th May 2018
You face risks when hiring any contractor, but especially a demolition contractor. Not covering your bases and hiring the first crew you encounter is not …

The Importance of Personal Protective Equipment in Demolitions

Published 06th May 2018
SV Demolition is proud of our zero incident safety record. We know there are many ways to get injured on a demolition site. Given the …

How Demolition Benefits Your Community

Published 27th Apr 2018
Demolition means destruction to many people. It is rarely viewed as a necessary step towards positive change and growth. However, the benefits of demolition help …

How to Demolish a Building

Published 16th Mar 2018
If you are contemplating demolishing an older building to make way for new construction, you will have several options to consider for building demolition. The …

Tips From A Professional Demolition Company

Published 16th Mar 2018
Building demolition is a thoroughly researched, carefully orchestrate project. Demolition contractors must have integrity and be conscientious about both employee safety and environmental safety. Without …

More Tips On Safe Demolition Methods

Published 16th Mar 2018
In our last post, we highlighted some of our most important tips to residential builders for safety on the site. Here we continue that list. …

Surprisingly Common Hazardous Waste in a Demolition

Published 28th Feb 2018
The most well-known types of hazardous waste are asbestos and lead paint. SV Demolition runs into these two materials frequently, and we use the proper …

Sustainable Management of Construction and Demolition Debris

Published 28th Feb 2018
The eco-friendly movement and efforts to reduce carbon footprints are active in the construction and demolition (C&D) industry in America. Construction and Demolition materials consist …

Drone Use in Demolitions

Published 28th Feb 2018
Drones have increasingly been adopted by the demolition industry. Beyond aerial imagery, implementing drone technology is now used throughout the entire demolition lifecycle: initial site …