- 4 story, 12 unit occupied apartment complex.
- Remove exterior stucco and interior drywall in selective areas for seismic retrofit.
- Site prep all interior units with plastic walls and floor coverings to protect tenants’ property.
- Remove (2) 4 story high chimneys down to the foundation.
- Run mist throughout the day to mitigate dust.
- install and maintain debris chute throughout demolition.
- Zero complaints from nearby residents.