- Coordinate permit process with the city of San Jose.
- Coordinate with PGE, Water, and Sewer for safe-off\ cap.
- Install storm drain sediment filters and straw wattle to prevent water contamination.
- Demolish fire-damaged structure down to slab foundation.
- Scrape and remove all floor treatments from the slab.
- Power wash parking lot +\- 20,000 SF upon completion.