Scope

  • Cut 40,000 SF structure in half for adaptive reuse.
  • Demolish (1) 20,000 SF structure, including foundation, down to the dirt.
  • Demolish (1) 20,000 SF two-story structure back to exterior tilt-up walls.
  • Install tilt-up bracing to support the load during the demolition of 2nd floor and roof.
  • Removal of 48 trees, 600 linear feet of curb and gutter, 1680 cubic yards of concrete.
  • In-house fabrication of custom steel shaker plates for long construction entrance.
  • Install and maintain compliance of stormwater prevention program, including sediment filters in storm drains, perimeter straw wattle, covering all stockpiles, weed abatement.
  • Rough grade +\- 4″ upon completion.