- Remove (9) portable classrooms and (3) playgrounds at a school in Menlo Park that was about to undergo renovation/ expansion.
- Utility excavation and cut/ cap to all structures prior to demolition commencement.
- Affluent residential neighborhoods required constant dust control with recycled water from our water trucks.
- Rough grade +/- 6″ upon completion.
- Worked alongside several other subcontractors in close proximity.