Scope

  • Install shoring for (12) 24″ glulam joists, prior to selective demolition of the storefront.
  • Cut and separate roof line prior to storefront demolition.
  • Wall saw CMU floor to ceiling in (2) locations, separating structure from Dollar Tree and Rite Aid.
  • Demolish 10,000 SF of structure, including foundation and piers, down to the dirt.
  • Demolish 3,000 SF interior mezzanine, down to the slab.
  • Slab saw and break out 6,400 SF of the interior slab.
  • Slab saw and break out 1,100 SF of the interior slab.
  • 13,000 SF of roof tear-off in select locations.
  • Rough grade +/- 4″ upon completion.